The final phase of the Main Street reconstruction project for the section between Foch Bridge and Chesley Street, including Dock Street, is scheduled to begin on May 13, 2024, and continue until the end of November 2024. At a construction cost of approximately $9.1 million, the project aims to modernize and upgrade the water supply, sanitary sewer, and stormwater infrastructure along Main Street, benefiting Shediac residents. Additionally, asphalt, curbs, sidewalks, and property are included in the project scope.
Throughout the duration of the project, traffic management will be diligently overseen by a dedicated traffic control division. Two-way traffic flow will be maintained on Main Street, ensuring minimal disruption to the daily commutes of residents and businesses. However, Dock Street will remain closed to through traffic for the duration of the construction.
Updates:
- Week 26 (November 8, 2024) - Photos
- Week 25 (November 1, 2024)
- Week 24 (October 25. 2024)
- Week 23 (October 18, 2024) - Photos
- Week 22 (October 11, 2024) - Photos
- Week 21 (October 4, 2024)
- Week 20 (September 27, 2024)
- Week 19 (September 20, 2024)
- Week 18 (September 13, 2024)
- Week 17 (September 6, 2024)
- Week 16 (August 30, 2024)
- Week 15 (August 23, 2024)
- Week 14 (August 16, 2024)
- Week 13 (August 9, 2024)
- Week 12 (August 2, 2024)
- Week 11 (July 26, 2024)
- Week 10 (July 19, 2024)
- Week 9 (July 12, 2024)
- Week 8 (July 5, 2024) - Photos
- Week 7 (June 28, 2024)
- Week 6 (June 21, 2024)
- Week 5 (June 14, 2024) Photos
- Week 4 (June 7, 2024) Photos
- Week 3 (May 31, 2024)
- Week 2 (May 24, 2024)
- Week 1 (May 17, 2024)

Given the size and scope of the work, challenges may arise, and residents should anticipate some traffic delays even with two-way traffic as Main Street does become congested in peak season even with no construction. Residents are strongly advised to plan for additional travel time accordingly.
It is important to note that throughout the project duration, businesses in the area will remain accessible to patrons.
Residents will retain access to their driveways for parking purposes on a daily basis. However, in instances where work is immediately in front of a property, designated temporary parking areas will be assigned for affected residents on those days.
We appreciate your cooperation and patience during this period of infrastructure enhancement. Should you have any inquiries or require further information, please do not hesitate to contact the Town of Shediac at 506 532-7000 or by email at This email address is being protected from spambots. You need JavaScript enabled to view it..